Risk Register Tool
Write down what could knock the plan off course, score each risk for probability and impact, and give it one owner and a treatment. Hold the spare time as one shared buffer, and set the dates you review it.
This tool also runs as a stage in a playbook, which takes you through several tools in order:
- Plan a project that finishes on time Stage 5 of 6: what could knock the plan off course? Start at stage 1
- Decide on a major investment Stage 6 of 6: what could still go wrong once you commit? Start at stage 1
Not following the playbook?
The limit: the most the business will accept losing
- Set it before looking at the risks: without a limit, every risk looks worth treating, and none can be called acceptable.
- A good guide is the reserve the business keeps, or what it could lose without breaking a loan covenant or cutting jobs.
What could still go wrong once you commit
- Scenarios covered the futures nobody controls. These are events that could still hurt once the money is spent: a late installation, a failed audit, a key person leaving, a currency swing.
- What it could cost is chosen as a band sized from the limit: minor (up to a tenth of it), moderate (up to half), major (up to the limit), or beyond the limit. Few businesses can put a reliable figure on a risk, but most can say which band it falls in. Once treated: the band it would fall in with the action in place.
- Treatments: avoid (don't do what carries it), reduce (lower the chance or the cost), transfer (a contract, a hedge or insurance carries it), accept (carry it on purpose, inside the limit).
- Give each one owner, a person rather than a team, and a date. A treatment with no owner is a wish; one with no date is an intention.
What could go wrong
- Write each risk as a cause, an event and a consequence, so someone outside the room would recognize it when it starts.
- Look at what has the widest estimates, what waits on a decision outside the team, what depends on a supplier, and who is busiest.
- One risk at a time: the others fold to a line.
Your risks never leave your browser
What you write about each risk, and the names of owners and activities, stay on your computer and in your progress file. To write the diagnosis, only the scores and treatments are sent to our server, by place in your list. How it works
Signposts and reviews
The signposts from stage 5 say early which future is arriving. Give each one an owner, and set how often the register and the signposts are looked at together.
Who watches each signpost
How often it is all reviewed
- Monthly suits most investments once committed; weekly while the money is being spent on a tight schedule.
Score, buffer and reviews
The risks by probability and impact: the top right corner is where to look first. Then the spare time, held in one place by one person, and how often the register is looked at again.
Probability and impact
One shared buffer
How often the register is reviewed
Risks change: some fade, some grow, new ones turn up. Every two weeks suits a project of a few months.
The register, biggest first
Where each risk sits
Signposts and reviews
The checks
Results are estimates to support a decision, not financial advice. Tax rules vary by country: check yours with an accountant.
The register, biggest first
Probability and impact
The buffer, the early signs and the reviews
Save your progress
Download your progress file to continue from this point any time, on any computer: choose it under "Coming back?" at the start of the tool. Each new file includes everything so far, including the earlier stages when they are connected, so keep the latest one. Your work stays in this browser only until you close it.
Not saved yet.
Take your results with you
A PDF of the register, the probability and impact matrix, the buffer and review dates, and the diagnosis.
About the tool
Why it exists
Risks with owners, not a list of worries
Every plan has things that could knock it off course. Listed and filed, they get noticed when they have already happened. A risk register makes each one specific, scores it, and gives it one person who watches for it and a planned response, with the spare time held in one place for whichever comes true.
It works on its own, and as stage 5 of our playbook for planning a project that finishes on time, where it takes the plan from the earlier stages and suggests the risks it can see in it.
The method
How the tool works
Cause, event, consequence. Each risk is written in three parts: what makes it possible, what could happen, and what it would do to the plan. "Customs" is a worry; "a new broker's paperwork holds the sofas at the port, and the showroom opens half empty" is a risk someone can watch for.
The score. Probability times impact, each from 1 to 5, so a score runs from 1 to 25. The matrix puts each risk in its cell: the top right is where to look first.
Four treatments. Avoid (don't do the thing that carries the risk), reduce (lower the probability, the impact, or both), transfer (move the cost by contract or insurance; the delay still happens), accept (carry it on purpose, and watch it).
One owner, one early sign. Each risk has one person who watches for it. An early sign, with the week it is due, says what they would see first.
One shared buffer. The time between the plan's finish and the date, kept at the end and held by one person, rather than padding spread on each activity, where it gets used up wherever it sits. In the playbook, the tool shows how much of it PERT expects to be used.
Suggested risks. In the playbook, the tool drafts risks from the plan: the activities with the widest estimates, decisions made outside the team, work that depends on a supplier, and people booked above 80%. Each is a draft to check, score, or remove.
What leaves your computer. What you write stays in your browser and your progress file. To write the diagnosis, the page sends our server only the scores and treatments, by place in your list, and the server keeps nothing.